Since I am skipping around between the Systems section and the Final Assembly section, I might have some of the items listed in the wrong section, or not at all. As I get farther along in the build, my notes and pictures aren't as plentiful as they were in the beginning of this project... :-)
29 Aug 2010 - 5 hrs
Fabricate panel brackets (install at upper inside edge of firewall).
Gather parts for door assembly.
Rivet aileron stop adjustors.
23 Oct 2010 - 3 hrs
Fit right seat pan.
24 Oct 2010 - 5.5 hrs
Install seat tracks, seat backs, and fabricate seat sliders.
30 Oct 2010 - 5 hrs
Fit left seat pan. Sand both seat pans. Fix bad cage bolt tab. Drill and deburr seat tracks.
31 Oct 2010 - 5 hrs
Fabricate, drill and install seat latch pins. Fabricate template for floorboards, and fabricate floorboards. Fabricate template for firewall.